Drainage Strategy for a single dwelling in Over, Cambridgeshire

Case study

A drainage strategy for a single dwelling in Over, Cambridgeshire, prepared for planning and approved.

The constraint

Infiltration testing confirmed the ground would take water, so the scheme could discharge at the top of the drainage hierarchy rather than relying on a restricted discharge.

What we did

The scheme uses rainwater harvesting, a proprietary treatment system, filter drains, permeable paving and a detention basin.

The numbers

Climate change allowance, 1 in 30 year35%
Climate change allowance, 1 in 100 year40%
Onn Point proposed drainage strategy for a development in Over, Cambridgeshire
The drainage strategy for this scheme, as it went to planning. Client name and address removed.

Every SuDS option, and why

Each option in the SuDS hierarchy was considered for this site. This is the assessment as it went into the report:

OptionUsedWhy
Green RoofsNoGreen roofs have not been proposed for this site as there is insufficient access to roof areas for maintenance and as such the system could not be effectively maintained to ensure long term performance. Soakaways and permeable surfacing is proposed to allow.
Filter StripsNoFilter strips have not been considered the most effective proposal for this site due to the proposed site layout.
SwalesNoSwales are not suitable for this scheme due to available space and proposed land use.
Bioretention SystemsNoBioretention Systems have not been considered the most effective proposal for this site due to the lack of available landscape areas.
Porous PavementsYesAll hardstanding are proposed to be of permeable construction Soakaway crates will provide attenuation prior to discharge into the.

The kind of condition this discharges

Wording differs between officers, but a scheme like this one is normally answering a condition along these lines:

No development shall commence until a detailed surface water drainage scheme, based on sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development, including infiltration testing carried out in accordance with BRE Digest 365, has been submitted to and approved in writing by the Local Planning Authority.

The infiltration testing and the soakaway sizing are what answer this one. There is a fuller guide to discharging drainage planning conditions if you want to read up on the process.

Outcome

Hydraulic simulation showed no flooding in the 1-, 30- or 100-year storm events, including the climate change allowance. The scheme was approved at planning.

Every scheme in these case studies was approved — that is the point of the exercise. If you have a drainage condition to discharge, send us the wording and the site address and we will tell you exactly what is needed.

Browse the rest of our case studies, see what a drainage strategy involves, or find where we work.