Drainage Strategy for a single dwelling in Chesham

Case study

A drainage strategy for a single dwelling in Chesham, prepared for planning and approved.

The constraint

The first question on any site is whether the ground will take water, because that decides whether the scheme is a soakaway or attenuation with a restricted discharge.

What we did

The scheme uses rainwater harvesting, raingardens and permeable paving.

The numbers

Climate change allowance, 1 in 30 year35%
Climate change allowance, 1 in 100 year40%
Management catchmentColne
Onn Point proposed drainage strategy for a development in Bucks
A drainage strategy from one of our schemes in this area, approved at planning. Client name and address removed.

Every SuDS option, and why

Each option in the SuDS hierarchy was considered for this site. This is the assessment as it went into the report:

OptionUsedWhy
Green RoofsNoGreen roofs have not been proposed for this site. Cellular Soakaway Systems have been proposed.
Proprietary Treatment SystemsNoThe use of proprietary treatment systems is not considered required for this development due to the lack of hardstanding area that is subject to oil, or similar pollutants caused by vehicular.
Filter DrainsNoFilter Drains have not been proposed as they are not deemed required.
SwalesNoSwales have not been proposed as they are not deemed required.
Bioretention SystemsYesThe use of rain gardens or over ground planters is recommended to help capture water at source and naturally reduce flows into the proposed soakaway.
Porous PavementsYesIt is recommended that all hard surfaces are to be of permeable construction.

The kind of condition this discharges

Wording differs between officers, but a scheme like this one is normally answering a condition along these lines:

No development shall commence until a detailed surface water drainage scheme, demonstrating that surface water will be restricted to greenfield run-off rates for all storm events up to and including the 1 in 100 year event plus an allowance for climate change, has been submitted to and approved in writing by the Local Planning Authority.

The greenfield run-off calculation and the attenuation volume are what answer this one. There is a fuller guide to discharging drainage planning conditions if you want to read up on the process.

Outcome

The scheme was approved at planning.

Every scheme in these case studies was approved — that is the point of the exercise. If you have a drainage condition to discharge, send us the wording and the site address and we will tell you exactly what is needed.