Drainage Strategy for an agricultural building in Romsley

Case study

A drainage strategy for an agricultural building in Romsley, prepared for planning and approved.

The constraint

The first question on any site is whether the ground will take water, because that decides whether the scheme is a soakaway or attenuation with a restricted discharge.

What we did

Attenuation storage of 65m³ was provided for the 1-in-100-year event including a climate change climate change allowance.

The numbers

Discharge rate1.71 l/s
Attenuation storage65m³
Onn Point proposed drainage strategy for a development in Birmingham
A drainage strategy from one of our schemes in this area, approved at planning. Client name and address removed.

The kind of condition this discharges

Wording differs between officers, but a scheme like this one is normally answering a condition along these lines:

No development shall commence until a detailed surface water drainage scheme, demonstrating that surface water will be restricted to greenfield run-off rates for all storm events up to and including the 1 in 100 year event plus an allowance for climate change, has been submitted to and approved in writing by the Local Planning Authority.

The greenfield run-off calculation and the attenuation volume are what answer this one. There is a fuller guide to discharging drainage planning conditions if you want to read up on the process.

Outcome

The scheme was approved at planning.

Every scheme in these case studies was approved — that is the point of the exercise. If you have a drainage condition to discharge, send us the wording and the site address and we will tell you exactly what is needed.