Drainage Strategy for a holiday park in Birmingham

Case study

A drainage strategy for a holiday park in Birmingham, prepared for planning and approved.

The constraint

The first question on any site is whether the ground will take water, because that decides whether the scheme is a soakaway or attenuation with a restricted discharge.

What we did

The scheme uses infiltration.

The numbers

Climate change allowance, 1 in 30 year35%
Climate change allowance, 1 in 100 year40%
Onn Point proposed drainage strategy for a development in Birmingham
A drainage strategy from one of our schemes in this area, approved at planning. Client name and address removed.

Every SuDS option, and why

Each option in the SuDS hierarchy was considered for this site. This is the assessment as it went into the report:

OptionUsedWhy
Rainwater HarvestingNoThe use of rainwater harvesting is not considered economically viable on this site considering installation and operational costs.
Green RoofsNoGreen roofs have not been proposed for this site as there is insufficient access to roof areas for maintenance and as such the system could not be effectively maintained to ensure long term performance.
Infiltration SystemsYesSystems such as stone filled soakaway trench have been proposed.
Proprietary Treatment SystemsNoThe use of proprietary treatment systems is not considered economically viable or required on this site considering installation and operational costs.
Filter StripsNoFilter strips have not been considered the most effective proposal for this site due to the proposed site layout.
Filter DrainsNoFilter Drains have not been considered the most effective proposal for this site due to the proposed site layout.
SwalesNoSwales are not suitable for this scheme due to available space and proposed land use.
Bioretention SystemsNoBioretention Systems have not been considered the most effective proposal for this site due to the lack of available landscape areas.
Porous PavementsNoThe use of porous paving is not considered economically viable on this site considering installation and operational costs.
Attenuation StorageNoThere is no need for attenuation due to the low amount of impermeable area.

The kind of condition this discharges

Wording differs between officers, but a scheme like this one is normally answering a condition along these lines:

No development shall commence until a detailed surface water drainage scheme, demonstrating that surface water will be restricted to greenfield run-off rates for all storm events up to and including the 1 in 100 year event plus an allowance for climate change, has been submitted to and approved in writing by the Local Planning Authority.

The greenfield run-off calculation and the attenuation volume are what answer this one. There is a fuller guide to discharging drainage planning conditions if you want to read up on the process.

Outcome

The scheme was approved at planning.

Every scheme in these case studies was approved — that is the point of the exercise. If you have a drainage condition to discharge, send us the wording and the site address and we will tell you exactly what is needed.

More on drainage design in Birmingham, browse the rest of our case studies, or see what a drainage strategy involves.