The constraint
The first question on any site is whether the ground will take water, because that decides whether the scheme is a soakaway or attenuation with a restricted discharge.
What we did
The scheme uses infiltration, swales and attenuation storage.
The numbers
| Climate change allowance, 1 in 30 year | 35% |
| Climate change allowance, 1 in 100 year | 40% |

Every SuDS option, and why
Each option in the SuDS hierarchy was considered for this site. This is the assessment as it went into the report:
| Option | Used | Why |
|---|---|---|
| Rainwater Harvesting | No | The use of rainwater harvesting is not considered economically viable on this site considering installation and operational costs. |
| Green Roofs | No | Green roofs have not been proposed for this site as there is insufficient access to roof areas for maintenance and as such the system could not be effectively maintained to ensure long term performance. |
| Infiltration Systems | Yes | Systems such as cellular soakaway crates and swales have been proposed. |
| Proprietary Treatment Systems | No | The use of proprietary treatment systems is not considered economically viable or required on this site considering installation and operational costs. |
| Filter Strips | No | Filter strips have not been considered the most effective proposal for this site due to the proposed site layout. |
| Filter Drains | No | Filter Drains have not been considered the most effective proposal for this site due to the proposed site layout. |
| Swales | Yes | A swale has been sized and proposed to capture the roof area in full as per the proposed drainage strategy drawing. |
| Bioretention Systems | No | Bioretention Systems have not been considered the most effective proposal for this site due to the lack of available landscape areas. |
| Porous Pavements | No | The use of porous paving is not considered economically viable on this site considering installation and operational costs. |
| Attenuation Storage | Yes | The Attenuation crate has been provided in the form of crates to aGenuate the surface water whilst its being discharged into the ground. |
The kind of condition this discharges
Wording differs between officers, but a scheme like this one is normally answering a condition along these lines:
No development shall commence until a detailed surface water drainage scheme, demonstrating that surface water will be restricted to greenfield run-off rates for all storm events up to and including the 1 in 100 year event plus an allowance for climate change, has been submitted to and approved in writing by the Local Planning Authority.
The greenfield run-off calculation and the attenuation volume are what answer this one. There is a fuller guide to discharging drainage planning conditions if you want to read up on the process.
Outcome
Hydraulic simulation showed no flooding in the 1-, 30- or 100-year storm events, including the climate change allowance. The scheme was approved at planning.