Drainage Strategy for 2 dwellings in Shudy Camps

Case study

A drainage strategy for 2 dwellings in Shudy Camps, prepared for planning and approved.

The constraint

Infiltration testing on site confirmed the ground would not take water, so a soakaway was not an option. That ruled out the top of the drainage hierarchy and set the shape of everything that followed.

What we did

The scheme uses rainwater harvesting, permeable paving and attenuation storage.

Attenuation storage of 81m³ was provided for the 1-in-100-year event including a 45% climate change allowance.

The numbers

Attenuation storage81m³
Climate change allowance, 1 in 30 year35%
Climate change allowance, 1 in 100 year45%
Management catchmentCombined Essex
Site classificationGreenfield
Onn Point proposed drainage strategy for an industrial development in Shudy Camps
The drainage strategy for this scheme, as it went to planning. Client name and address removed.

Every SuDS option, and why

Each option in the SuDS hierarchy was considered for this site. This is the assessment as it went into the report:

OptionUsedWhy
Rainwater HarvestingYesRainwater butts are proposed to promote water re-use.
Green RoofsNoGreen roofs have not been proposed for this site as there is insufficient access to roof areas for maintenance and as such the system could not be effectively maintained to ensure long term performance.
Infiltration SystemsNoGround conditions are not suitable for the use of infiltration.
Proprietary Treatment SystemsNoThe use of proprietary treatment systems is not considered economically viable or required on this site considering installation and operational costs.
Filter StripsNoFilter strips have not been considered the most effective proposal for this site due to the proposed site layout.
Filter DrainsNoFilter Drains have not been considered the most effective proposal for this site due to the proposed site layout.
SwalesNoSwales are not suitable for this scheme due to available space, topography and proposed land use.
Bioretention SystemsNoBioretention Systems have not been considered the most effective proposal for this site due to the lack of available landscape areas.
Porous PavementsYesDriveway and access to be tanked permeable surfacing to help improve water quality.
Attenuation StorageYesAttenuation provided through the use of a pond.
Detention BasinNoThere is sufficient space for a detention basin on this site Attenuation pond proposed.

The kind of condition this discharges

Wording differs between officers, but a scheme like this one is normally answering a condition along these lines:

No development shall commence until a detailed surface water drainage scheme, demonstrating that surface water will be restricted to greenfield run-off rates for all storm events up to and including the 1 in 100 year event plus an allowance for climate change, has been submitted to and approved in writing by the Local Planning Authority.

The greenfield run-off calculation and the attenuation volume are what answer this one. There is a fuller guide to discharging drainage planning conditions if you want to read up on the process.

Outcome

Hydraulic simulation showed no flooding in the 1-, 30- or 100-year storm events, including the climate change allowance. The scheme was approved at planning.

Every scheme in these case studies was approved — that is the point of the exercise. If you have a drainage condition to discharge, send us the wording and the site address and we will tell you exactly what is needed.

Browse the rest of our case studies, see what a drainage strategy involves, or find where we work.