A soakaway has to hold the storm, empty in time for the next one, and sit where it can’t harm a building or a neighbour. BRE Digest 365 is the UK method for getting all three right. This guide explains how we turn a measured infiltration rate into a soakaway design that building control and the lead local flood authority (LLFA) will accept.

What is BRE Digest 365?
BRE Digest 365, Soakaway design, is published by the Building Research Establishment. The current edition is the 2016 revision. It covers two things:
- a site test that measures how quickly water soaks into the ground (the infiltration rate)
- a design method that uses that rate to size a soakaway for a given storm
Approved Document H of the Building Regulations refers to it for soakaway design, and most LLFAs expect it behind any infiltration design submitted with a planning application. It is a drainage design method, not an environmental or energy rating.
The infiltration test, in brief
- A trial pit is dug where the soakaway is proposed, to the depth the soakaway will be.
- The pit is filled with water and the fall in level is timed. This is done three times, on the same day or on consecutive days.
- For each fill, the test records the time the water takes to fall from 75% to 25% of the effective depth.
- The infiltration rate, f, is the volume of water lost between 75% and 25%, divided by the wetted area of the pit at half depth and by that time. It is given in metres per second (m/s).
- The design uses the slowest of the three results, because the ground drains more slowly once it is wet.
As a rough guide, clays are often below 1 × 10⁻⁶ m/s, usually too slow for a soakaway; silts and sands are roughly 10⁻⁶ to 10⁻⁴ m/s.
Don’t confuse this with the Building Regulations percolation test for a foul drainage field, which gives Vp in seconds per millimetre. That is not an infiltration rate and can’t be used to size a soakaway.
Need the test itself? Our sister company Percolation Tests carries out the percolation test on site to BRE 365, and we design the soakaway from the results. Our percolation testing page explains how the two fit together.
How a BRE 365 soakaway is sized
The design storm
- Building regulations: the BRE 365 basis is a 1 in 10 year storm.
- Planning and LLFAs: these normally ask for more.
- No flooding on site in a 1 in 30 year storm.
- No flooding of buildings in a 1 in 100 year storm plus climate change, with any surface water above ground kept safely on site.
- We check the 1 in 30 year storm with climate change as well as the 1 in 100 year plus climate change.
- Climate change: we take the Environment Agency peak rainfall allowance for the site’s management catchment, using the upper end for the 2070s on residential schemes. This is typically 35% to 40%, and up to 45% in some catchments.
- Urban creep: on housing we usually add 10% to the impermeable area, where the LLFA asks for it.
- Rainfall data: we use the current FEH (FEH22) rainfall data rather than the older FSR figures, unless the LLFA asks otherwise.
Inflow, outflow and storage
The calculation is a balance. For each storm duration:
- Inflow is the rainfall over the drained area: roofs, drives and any other impermeable surfaces.
- Outflow is what soaks into the ground while it rains: the infiltration rate multiplied by the soakaway’s wetted area and the storm duration.
- Storage is the difference, and the soakaway must hold it.
The wetted area is taken as the sides of the soakaway up to half its storage depth. BRE 365 leaves out the base, on the basis that it silts up over time; we do the same and design on the sides alone.
We repeat this for durations from a few minutes to a day or more. The duration needing the most storage is the critical storm, and it sets the size.
Factor of safety
CIRIA’s SuDS Manual (C753) applies a factor of safety of 1.5 to 10 to the measured rate, depending on the area drained and the consequence of failure. Some LLFAs set their own. We state the factor used, and why.
Half-drain time
A soakaway should empty from full to half full within 24 hours, so it has room for the next storm. We state it in hours, checked on the 1 in 30 year plus climate change event unless the LLFA asks for another. Shape matters: a long, narrow trench has far more side area than a square pit of the same volume, so it often empties much faster.
Crates or rubble?
- Clean stone or rubble: about 30% voids, so roughly three times the dug volume of a crate soakaway for the same storage. Simple and cheap for small areas such as a single house, but hard to inspect once buried.
- Geocellular crates: about 95% voids, so far more compact, and some systems can be inspected or jetted. The crate product and the cover over it must suit the loading above, to the manufacturer’s guidance.
Either way, the soakaway is wrapped in geotextile and fed through a catchpit or silt trap, so silt is caught before it can clog the ground.
Where a soakaway can go
- Buildings and highways: at least 5 m from a building or public highway, so water isn’t fed towards foundations or under the road.
- Boundaries: 2.5 to 5 m from a boundary, depending on the authority and the project, so the neighbour’s land isn’t affected.
- Groundwater: the base at least 1 m above the highest seasonal groundwater level. A reading taken in summer is not the seasonal high.
- Ground: natural, uncontaminated ground, not made ground or fill, and away from unstable ground. Infiltration is restricted near public water supplies (Source Protection Zone 1).
- Depth: the test must have been done at the depth the soakaway will be built.
When infiltration is too slow
Surface water follows a set order of preference:
- into the ground
- to a watercourse
- to a surface water sewer or highway drain
- to a combined sewer
Each option must be ruled out with evidence before moving to the next, and a failed infiltration test is that evidence. Off site, the flow is normally limited to the greenfield rate or a rate the LLFA has agreed, which means attenuation (a tank, pond or permeable paving) emptied through a flow control. A combined sewer connection needs the water company’s agreement.
What our soakaway design includes
For a single plot going through building control:
- a check of the test results, using the slowest rate and the right units
- the design storm, climate change and urban creep allowances, stated
- BRE 365 calculations for each storm checked, with the storage volume, the soakaway’s size and depth, and the half-drain time
- the factor of safety and why it was chosen
- a layout showing clearances to buildings and boundaries, and a construction detail (crates or stone, geotextile, catchpit)
For planning, the soakaway sits inside a full SuDS report. That adds:
- the discharge hierarchy
- an assessment of each SuDS option
- water quality, using the Simple Index Approach
- exceedance flow routes
- a lifetime maintenance plan
Where the site needs pipe networks and attenuation as well, see our drainage design service. For a first estimate before the test, try our soakaway size calculator.
Frequently asked questions
The percolation test is the site work: a trial pit is filled three times and timed to measure the infiltration rate. Soakaway design is the calculation that uses that rate to size the soakaway for the design storm, check that it half-empties within 24 hours, and position it safely. Our sister company Percolation Tests carries out the test; Onn Point does the design.
For building regulations, BRE 365 uses a 1 in 10 year storm. For planning, LLFAs usually want no flooding on site in a 1 in 30 year storm, and no flooding of buildings in a 1 in 100 year storm with an allowance for climate change, typically 35% to 45% depending on the catchment.
At least 5 m from a building or public highway. It should also be 2.5 to 5 m from a boundary, depending on the authority and the project, and its base must be at least 1 m above the highest seasonal groundwater level.
A failed test is still useful: it is the evidence needed to rule infiltration out. Surface water then goes to a watercourse if there is one, or else to a surface water sewer, usually with attenuation storage and a flow control so it leaves the site at an agreed rate.
No. The Vp test, in seconds per millimetre, is for sizing foul drainage fields. A soakaway needs an infiltration rate in metres per second, measured to BRE 365.
Get your soakaway designed
If you already have BRE 365 infiltration results, or need the testing done as well, we can size the soakaway and write it up for building control or your planning condition. Send us the site address and the council’s wording for a fixed quote, or call us on 01902 585 206.
