Flood Risk Assessment

Flood Risk Assessments (FRA) are a crucial step in the development process, as they help identify potential flood risks and inform the design of flood protection measures. They are used to assess the likelihood of flooding from various sources, such as rivers, the sea, and surface water, and to determine the potential consequences of a flood event.

It evaluates watercourse size, landscape type, ground cover and soil permeability, and the risk posed by both existing and proposed development. The process of conducting a Flood Risk Assessment typically includes the following steps:

1

Identifying the source of flooding

This step involves identifying the potential sources of flooding, such as rivers, the sea, and surface water.

2

Determining the likelihood of flooding

This step involves assessing the likelihood of flooding from each identified source, taking into account factors such as weather patterns, topography, and land use.

3

Assessing the potential consequences of flooding

This step involves determining the potential consequences of a flood event, such as damage to property and infrastructure, and the potential impact on human health and the environment.

4

Identifying and evaluating potential flood protection measures

This step involves identifying and evaluating potential flood protection measures, such as building flood walls, creating flood storage areas, and raising the level of existing structures.

5

Developing a flood management plan

This step involves developing a comprehensive flood management plan, which sets out the measures that will be taken to reduce the risk of flooding and to mitigate the consequences of a flood event.

 

What is a flood risk assessment?

A flood risk assessment is a site-specific report setting out how flooding could affect your development over its lifetime, and what the design has to do about it. It is a planning document before it is a technical one: your local planning authority reads it, and on larger or higher-risk sites so does the Environment Agency.

It has to account for every source, not only rivers and the sea — surface water and overland flow, groundwater, sewers, and artificial sources such as reservoirs and canals, along with the way they interact. Where development is acceptable in principle, the assessment then sets finished floor levels, safe access and egress, flood resilience measures and any compensatory storage the scheme needs.

If you are not sure whether your site needs one, send us the address and we will tell you.

Why Choose Our Flood Risk Assessment Consultants?

We are a trusted and experienced team of Wolverhampton and Birmingham flood risk assessment consultants who understand the ever-changing nature of flooding risks. We provide comprehensive flood risk assessments that enable clients to make informed decisions on their development plans and provide valuable insight into how best to mitigate future flooding.

Our services are tailored to meet your individual requirements, ensuring you have the most up-to-date information available. We also offer advice on long-term strategies to reduce the risk posed by flooding, such as installing a soakaway.

We are committed to providing a comprehensive and professional service that meets your needs and helps ensure the safety of you, your property and your development.

OUR WORK

Client Reviews

We are incredibly proud of our customer feedback please read some of our testimonials below.

Posted on Google Google
Andy Kerik profile picture
Andy Kerik
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Rob from On Point is exceptionally professional and an all-round great person to work with. We had a very complex project, and he supported us at every stage, helping us navigate all the challenges right through to securing planning permission. I highly recommend this company to anyone needing drainage design or similar services. Thank you so much, Rob — you’re a star!
Posted on Google Google
Ryan Taylor profile picture
Ryan Taylor
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Outstanding service from Onn Point, great dialogue throughout the process and extremely fast turnaround to help get my project going quickly.
Posted on Google Google
Nick Puleston profile picture
Nick Puleston
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We instructed Rob and his team to design a drainage strategy for our New Build in Plymouth. The LLFA raised several points that needed addressing which Rob made a priority to complete. Even though our Architect wanted to proceed to full planning with a pre condition, Rob eventually managed to address all points raised and we now have full planning permission approved by the LLFA. Our build is very complex and Rob overcome every hurdle. We can’t thank Rob and his team enough for their dedication and expertise.
Posted on Google Google
ashley Cook profile picture
ashley Cook
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Fantastic company Rob & his colleagues helped me with a condition I had on my planning. He kept me informed all the way through the process & was very thorough. The condition was lifted with all his help. I would not hesitate to recommend Rob & his colleagues.
Posted on Google Google
Malcolm Aitken profile picture
Malcolm Aitken
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We needed a surface water drainage plan to satisfy a pre commencement planning condition. Onn Point Civil Engineering produced a very good report which was approved by the local council and at a sensible price too
Posted on Google Google
Christopher Hughes profile picture
Christopher Hughes
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Highly recommended drainage specialists, flawless, great communication and very thorough. I will be using Onn Point again for further work early 2025.
Posted on Google Google
Tim Lamont profile picture
Tim Lamont
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
I fully recommend Onn-Point Civil Engineering ltd, we used them for retrospective drain planning, SUDS Reports, Percolation Tests & Drainage Design, on our single dwelling construction, in Mid Sussex. Rob and Andrew were extremely supportive and guided us through the process and produced a very comprehensive report, for town planning which was successful for our application. this helped us a great deal/ They are without doubt very experienced in their field. I would use them again. Tim Lamont
Posted on Google Google
Preston Jones profile picture
Preston Jones
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great service. Took the time to explain technical issues with a non professional. Andy and Rob were great. I would definetly recommend.
Posted on Google Google
David Williams profile picture
David Williams
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Excellent service, very professional and delivered on time. Very pleased overall, thank you
Posted on Google Google
Liam Devaney profile picture
Liam Devaney
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Rob and the team at Onn-Point have been brilliant throughout the process. Friendly, polite and professional. Great communicators and a pleasure to work with
Verified by Trustindex
Trustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more

See a real flood risk assessment

A full flood risk assessment we prepared and took through planning. It works through the sequential and exception tests, the flood levels the site will see over its lifetime including a climate change allowance, and sets finished floor levels and safe access against them — with the Environment Agency and BGS data the conclusions rest on included in full.

PDF · 37 pages · 0.6MB

Open full screen

Frequently asked questions

What are the different Flood Zones in England?

In England, flood zones are designated by the Environment Agency to indicate the likelihood of flooding in an area:
Flood Zone 1: Low Probability
  • Less than 0.1% chance of flooding per year.
  • Most developments are safe here, and a Flood Risk Assessment (FRA) is usually not required unless the site is large or has specific risks.
Flood Zone 2: Medium Probability
  • 0.1% to 1% chance of river flooding per year; 0.1% to 0.5% for sea flooding.
  • Developments may need an FRA, especially for residential or vulnerable uses.
Flood Zone 3a: High Probability
  • Greater than 1% chance of river flooding per year; greater than 0.5% for sea flooding.
  • Strict development controls apply, and an FRA is required. Highly vulnerable developments are typically restricted.
Flood Zone 3b: Functional Floodplain
  • Greater than 5% chance of flooding per year.
  • Development is highly restricted, with only essential infrastructure and water-compatible uses allowed. Flood risk assessments are mandatory.
What is the timeline to complete a Flood Risk Assessment (FRA)?

The time required to complete an FRA varies depending on the site’s complexity and the development scale:
Factors influencing the timeline include data availability, the need for detailed modelling, consultations with authorities, and regulatory approvals. Starting early in the planning process is advisable to avoid delays.
Who needs a Flood Risk Assessment?

FRAs are essential for:
  • Local Planning Authorities (LPA): To ensure compliance with flood risk regulations and safe development.
  • Developers and Architects: To design developments that minimise flood risks and meet regulatory standards.
  • Environment Agency: To assess and manage the impact of developments on flood risks.
  • Property Owners and Future Occupants: To ensure safety from flooding and protect property investments.
  • Insurance Companies: To determine insurance premiums based on flood risk.
  • Local Communities: To ensure new developments don’t increase flood risk in the area.
  • Consultants and Engineers: To analyse risks and propose mitigation measures.
Do I need a Flood Risk Assessment (FRA)?

If your development is in a flood-prone area, or if required by the Local Planning Authority, flood risk assessment planning is necessary. It helps manage and reduce flood risks, protecting people, property, and the environment. Contact us today to book your assessment.
When does a planning application need a flood risk assessment?

An FRA is normally required for any development in Flood Zone 2 or 3, for sites of one hectare or more in Flood Zone 1, and for smaller sites in Flood Zone 1 where there are other sources of flooding — surface water, groundwater, sewers or reservoirs. If you are unsure, send us the site address and we will check the Environment Agency mapping.

What sources of flooding does an assessment cover?

All of them, not just rivers and sea. A site-specific FRA considers fluvial and tidal flooding, surface water and overland flow, groundwater, sewer flooding, artificial sources such as reservoirs and canals, and the interaction between them.

Can I still build in Flood Zone 3?

Sometimes. It depends on the vulnerability of what you are proposing and whether the Sequential Test — and where relevant the Exception Test — can be passed. Where development is acceptable in principle, the assessment sets out finished floor levels, flood resilience measures, safe access and egress, and any compensatory storage needed.

How long does a flood risk assessment take?

That depends on the site, and we will give you a programme when we quote. Where modelled flood level data has to be requested from the Environment Agency, that request can add several weeks and is worth starting early.