Drainage Engineers in Shropshire

Where we work

We are drainage engineers and civil engineering designers working across Shropshire. We have delivered 10 projects here — drainage strategies, SuDS reports, flood risk assessments and highway design, prepared for planning and taken through to approval.

You do not need a consultant down the road from your site. This is desk work built on survey data, ground testing and the local authority’s own standards. What matters is that whoever does it knows what Shropshire Council asks for, and what the ground in Shropshire will actually do.

Onn Point proposed drainage strategy for a development in Albrighton, Shropshire
A drainage strategy we prepared for a site in this area, approved at planning. Client name, address and Ordnance Survey labels removed.
LondonManchesterBristolLeedsLiverpoolNewcastleNorwichPlymouthSouthamptonNottinghamSheffieldCarlisleYorkExeterCambridgeShrewsburyTelfordGloucesterDudleyBirminghamWolverhamptonOxfordKingstonCoventryHerefordReading

Our projects in Shropshire, in red, against the rest of England. One dot per project, placed within its postcode area rather than at the exact site. Zoom out for the full picture, or ctrl and scroll to zoom.

Civil engineering design in Shropshire

  • Drainage design in Shropshire — surface water and foul drainage strategies, attenuation, SuDS and outfall design, sized for your site and your discharge rate.
  • Highway design — access, visibility splays, turning heads and adoptable road design, including Section 38 and Section 278 agreements.
  • Flood risk assessments — site-specific flood risk assessments for sites in Flood Zones 2 and 3, and for sites over a hectare in Zone 1.
  • SuDS design — sustainable drainage design and the SuDS statement your planning authority expects, with the drainage hierarchy worked through in order.
  • Percolation testing — BRE 365 soakaway testing across Shropshire, arranged through PT (West Midlands) Ltd so the design and the testing come from one place.

Ground conditions in Shropshire

Shropshire’s solid geology runs from Precambrian through to Triassic, but for drainage purposes the superficial cover usually decides it: till and glacial outwash from the Late Devensian blanket much of the county. Glacial outwash sands and gravels can infiltrate freely; boulder clay in the same field will not. Neighbouring plots can behave completely differently, which is why we test rather than assume.

None of that tells us what is under your plot, and no report should pretend otherwise. It tells us what to expect, what to test for, and whether to plan for infiltration or for attenuation and a restricted discharge. A percolation test to BRE 365 settles it, and it is cheaper to do that before the design than to redesign afterwards.

Source: BGS, sheet 153 district description. Requirements and ground conditions both change — we check them at the start of every job.

The drainage hierarchy

  1. 1InfiltrationSoakaway or infiltration basin, if the ground takes it
  2. 2WatercourseDischarge to a surface water body, usually rate-restricted
  3. 3Surface water sewerWhere a public surface water sewer exists and has capacity
  4. 4Combined sewerLast resort, and increasingly refused outright

Every scheme has to work down this list in order, and show why each option above the chosen one was ruled out. The ground is what decides whether you get to stop at step one.

Shropshire at a glance

Lead local flood authority
Shropshire Council
Postcode areas
SY
Projects delivered here
10
Statutory consultee
Yes, on surface water for major development
Percolation testing
BRE 365, via PT (West Midlands) Ltd
Case studies
2

What Shropshire Council expects

Shropshire Council goes further than the statutory minimum: as well as being a consultee on major applications, it reviews surface water proposals on smaller developments too. A scheme below the major threshold still gets looked at here, which catches people out who assume minor works are unexamined.

Their SuDS Handbook sets local design standards and states what the authority expects in a drainage strategy for both major and minor development.

Source: Shropshire Council. Requirements and ground conditions both change — we check them at the start of every job.

Highway design in Shropshire

Drainage is the bulk of what we do, but in Shropshire a large share of it comes with highway design attached — because rural sites regularly turn on access and visibility onto fast roads before drainage is even discussed.

Access and visibility are usually settled before drainage, because they constrain the layout itself. We design accesses, visibility splays, turning heads and adoptable carriageways, and take them through Section 278 works to the existing highway and Section 38 adoption of new roads with the highway authority for Shropshire. Leaving this late is expensive: it can mean redrawing the site plan and the drainage with it.

We do this as part of the same job, so the highway design and the drainage strategy agree with each other rather than being written by two firms who never spoke. More on highway design.

Onn Point proposed drainage strategy for a development in Hailsham
A proposed drainage strategy from our own drawing set, approved at planning. Client name, address and Ordnance Survey labels removed.

What you need, and when

The work is not one document handed in once. It arrives in stages, and sending the wrong level of detail at the wrong stage is one of the commonest reasons an application stalls with Shropshire Council.

  • Outline application. A strategy showing the principle: where the water goes, roughly what it will take, and that the site can be drained at all. Detailed calculations are not expected yet, but a strategy that ignores the discharge hierarchy will be questioned.
  • Full application. The full surface water and foul scheme with calculations, layout, attenuation volumes and the discharge rate you are asking for, evidenced.
  • Reserved matters. The detail that was reserved at outline, now built out against the approved strategy — and it has to match it.
  • Discharge of conditions. The final submission against the wording of the condition itself, with the maintenance and management arrangements Shropshire Council asks for. This is the stage most people reach us at, often with a condition already imposed.

Where the work lands

  1. OutlineDrainage strategy: the principle, not the detail
  2. FullFull scheme, with calculations and discharge rate
  3. Reserved mattersThe detail, matching the approved strategy
  4. DischargeSubmission against the condition wording itself

Most people reach us at the last step, with a condition already imposed. That is fine — it is just cheaper to have got the strategy right at the first.

Typical conditions we discharge in Shropshire

Exact wording varies between officers and between applications, but conditions on sites here almost always fall into three shapes:

  • Surface water drainage. “No development shall commence until a detailed surface water drainage scheme, based on sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development, has been submitted to and approved in writing by the Local Planning Authority.” This is the one that needs the percolation results and the attenuation calculations.
  • Foul drainage. A scheme for foul water disposal, agreed before occupation — straightforward on a mains connection, considerably less so on a package treatment plant or where the sewer is at capacity.
  • Management and maintenance. A plan setting out who maintains the drainage for the lifetime of the development, and how. Often overlooked, and a common reason a discharge application comes back.

If you have a condition in front of you, send us the wording. We will tell you what it actually requires, before you commit to anything. There is a fuller guide to drainage planning conditions if you want to read up first.

Our work in Shropshire

Past project locations here include Shr-Op-Shire, Shropshire, Shrewsbury, Ludlow, Richards Castle and Little Hereford.

Questions we get asked in Shropshire

Do you need to be local to do this work?

No. It is done from survey data, ground investigation and Shropshire Council’s own standards, none of which require us to be nearby. Being the right distance from your site has never discharged a condition; knowing what the authority wants has.

Who is the lead local flood authority for my site?

Shropshire Council. They are a statutory consultee on surface water drainage for major development, and they set the local standards and the discharge rate your scheme is judged against.

Do I need a Section 38 or a Section 278 agreement?

Section 38 covers a new road you want adopted; Section 278 covers works to an existing highway, such as a new access. Many schemes in Shropshire need both, and they run to different timescales.

How early does highway design need to start?

Earlier than most people expect. Access and visibility often constrain the layout itself, so settling them late can mean redrawing the site plan and the drainage with it.

What holds a drainage scheme up?

Usually the ground testing, and where one is needed, the response time from Shropshire Council or the water company — not the design itself. Getting the testing booked early is the single biggest thing you can do to keep a scheme moving.

I already have a planning condition. Can you deal with it?

Yes, and it is most of what we do. Send us the condition wording and the site address and we will tell you what is needed to discharge it.