Drainage Strategy for 2 dwellings in Ovingdean

Case study

A drainage strategy for 2 dwellings in Ovingdean, prepared for planning and approved.

The constraint

Infiltration testing confirmed the ground would take water, so the scheme could discharge at the top of the drainage hierarchy rather than relying on a restricted discharge.

What we did

The scheme uses rainwater harvesting, a green roof, infiltration, permeable paving and attenuation storage.

Attenuation storage of 16m³ was provided for the 1-in-100-year event including a 40% climate change allowance.

The numbers

Attenuation storage16m³
Climate change allowance, 1 in 30 year45%
Climate change allowance, 1 in 100 year40%
Management catchmentAdur and Ouse
Onn Point proposed drainage strategy for a development in Hailsham
A drainage strategy from one of our schemes in this area, approved at planning. Client name and address removed.

Every SuDS option, and why

Each option in the SuDS hierarchy was considered for this site. This is the assessment as it went into the report:

OptionUsedWhy
Green RoofsYesGreen roofs have been proposed onsite as demonstrated on our proposed drainage layout.
Infiltration SystemsYesCellular Soakaways crates have been proposed as means of discharge of surface water into the ground.
Proprietary Treatment SystemsNoThe use of proprietary treatment systems is not considered required.
Filter StripsNoFilter strips have not been considered the most effective proposal for this site due to the proposed site layout.
Filter DrainsNoFilter Drains have not been considered the most effective proposal for this site due to the proposed site layout.
SwalesNoSwales have not been proposed due to the site levels constraint.
Porous PavementsYesIt is proposed that all hard surfaces are to be of permeable construction.
Attenuation StorageYesAttenuation storage has been provided in the form of cellular soakaway crates.

The kind of condition this discharges

Wording differs between officers, but a scheme like this one is normally answering a condition along these lines:

No development shall commence until a detailed surface water drainage scheme, based on sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development, including infiltration testing carried out in accordance with BRE Digest 365, has been submitted to and approved in writing by the Local Planning Authority.

The infiltration testing and the soakaway sizing are what answer this one. There is a fuller guide to discharging drainage planning conditions if you want to read up on the process.

Outcome

The scheme was approved at planning.