Our Services

What we do

Civil engineering design that discharges planning conditions

Onn Point proposed drainage strategy for a residential scheme in Tunbridge Wells
One of our proposed drainage strategies, approved at planning. Client name, address and Ordnance Survey labels removed.

Onn Point is a civil engineering design consultancy. We prepare the drainage, flood risk and highway documents a planning authority asks for, and we see them through to approval, whether that is a strategy submitted with the application or a condition already sitting on a decision notice.

What we design

We specialise in…

Drainage Civil Engineering Companies

Highway & Car Park Design

Access, visibility splays, turning heads, car park layouts and adoptable carriageways, designed to the highway authority’s standards and taken through Section 278 and Section 38 where adoption is needed.

A road layout drawn in CAD beside a three-dimensional model of the drainage network, over a rendered site model

Detailed Drainage Design

Full surface water and foul drainage schemes: pipe sizing, attenuation volumes, flow control and outfall details, with the calculations the authority needs to see before it will discharge your condition.

SuDS Reports

SuDS Reports

The sustainable drainage statement your planning authority expects, with the drainage hierarchy worked through in order and the maintenance arrangements set out for the lifetime of the development.

A reed-fringed watercourse running through pasture, the kind of outfall a restricted surface water discharge is made to

Flood Risk Assessments

Site-specific flood risk assessments for Flood Zones 2 and 3, and for sites over a hectare in Zone 1, sequential and exception tests applied, finished floor levels and safe access set against modelled flood levels.

Flood Risk Assessments

Percolation Testing

BRE 365 soakaway testing to establish whether infiltration is viable on your site, arranged through PT (West Midlands) Ltd so the testing and the design come from one place.

An operative in hi-vis feeding a CCTV survey camera cable into an open manhole set in block paving

CCTV Surveys

Camera surveys of existing drainage to establish what is there, where it runs and what condition it is in, often the quickest way to settle a connection question before the design starts.

Blue geocellular crates bedded on gravel in an excavated trench, forming an attenuation soakaway, with the inlet pipe connected

Soakaway Calculations

Soakaway sizing from your percolation results and impermeable area, so a scheme is not held up waiting on a single number.

Client satisfaction is our #1 priority

We are ready to do the job.

18 Years Experience

Working in both commercial and residential projects across the country.

Qualified Civil Engineer

Design work carried out by qualified engineer

Innovative Solutions

Create innovative designs to reduce cost on site and satisfy SuDS

Star Validated

We have an in house validation service to ensure designs meet authorities requirements.

How it works

From your condition to a discharged one

Most people come to us with a planning condition already imposed and a deadline attached to it. The route through is the same either way.

  • Send us the wording. The condition text and the site address are usually enough. We will tell you what it actually requires, and if you do not need us, we will say so.
  • We check the authority and the ground. Which lead local flood authority covers the site, what discharge rate they allow, and whether the ground is likely to take infiltration at all. That decides the shape of the scheme.
  • Testing where it is needed. A BRE 365 percolation test settles whether a soakaway is viable. Doing it before the design is cheaper than redesigning after.
  • Design and calculations. We will give you a programme when we quote, so you know where you stand before committing.
  • Submission and follow-through. We answer the officer’s queries rather than handing you a PDF and wishing you luck.

Common questions

Do you have to be local to my site?

No. This is desk work built on survey data, ground testing and the local authority’s own standards. What matters is knowing what your authority asks for, see where we work for the areas we cover and the authority for each.

How much does it cost?

It depends on the site and the condition. Send us the wording and we will quote for it before you commit to anything.

What if a soakaway will not work on my site?

That is a normal outcome, not a failure, across much of England the ground will not infiltrate. We design attenuation with a restricted discharge instead, which is what a large share of schemes end up with.

Can you take on a scheme someone else started?

Yes, and often the quickest fix is reviewing what has already been submitted against what the authority actually objected to.

More answers, including lead times, what we need from you and payment terms, are on our frequently asked questions page.

Tell us about your site

Send us the site address and the condition wording, or the planning reference, and we will tell you exactly what is needed. If you do not need us, we will say so.